You need to drive rural Alberta more.....The areas that are fighting this train aren't very populated in Ontario and Quebec. Why would the same demographic act differently in Alberta with the exact same concerns?

You need to drive rural Alberta more.....The areas that are fighting this train aren't very populated in Ontario and Quebec. Why would the same demographic act differently in Alberta with the exact same concerns?
fewer settlements to by-pass coupled with more open countryside and easier land to dig through. Not as many rocks to blast or rivers to bridge. Not as many lakes to that either increase the complexity and cost or dictate a route that is longer and more expensive. It is easier to follow section lines when delineating a route because there have been fewer cases where large parcels have been divided up. Less expensive land to have to buy. More receptive residents. That's a few of the more obviousI'm curious how you know that it's so straightforward, when nobody has done anything but a paper study on this before. And to be noted, none of those paper studies on CalEd came close to the business case of the Corridor. But even setting that aside, paper studies are all great. The real hard work comes exactly with what Alto is doing now. It's when you have to make design trade-offs, assemble land, etc. I'm curious why you think this would be magically easier in Alberta. Especially when they haven't done that Alto has done until this point.
Finally, Alto is deliberately sequencing phases as a risk réduction mesure. That's why Ottawa-Montreal is going first.
the route is easier to map out without ripping up someone's farm. Quite conceivable to follow a section line for miles so it would be the back of two ranches. Fewer roads to cross as well. And yes the people fighting this are from the less populated areas. That's a given considering it is their homes you are bulldozing. Residents in the Golden Horseshoe could care less until they see the real bill. I doubt very much if the people on the designated route gave a positive response to the survey.The areas that are fighting this train aren't very populated in Ontario and Quebec. Why would the same demographic act differently in Alberta with the exact same concerns?
You mean the place where they'll have to cross a road every mile? Yeah. Really going to turn out differently when they propose closing a lot of this instead of spending $25-50M for every crossing.You need to drive rural Alberta more.....
Haven't driven there much have you/ On google maps you will see gridlines every mile. Only about 1 in 3 is actually active as a road with the rest being field boundaries left over from when quarters and sections measured a farm holding. Now that 6 and 10 sections can make up a property many of those roads have been integrated into the ranch itself serving as access routes to the back fields. Many of those remaining as roads have been truncated: they are dead ends or simply connect two adjacent Range Roads. If you chose carefully you could probably go 10 miles before you would need an underpass constructed and without having to divide a single holding.You mean the place where they'll have to cross a road every mile? Yeah. Really going to turn out differently when they propose closing a lot of this instead of spending $25-50M for every crossing.
Somehow I don't think the politics will be all that different when the issues are exactly the same.
My favourite is the proposal - seriously put forward - that HSR could follow the 401 corridor.All of these alternative proposals are based on fantasies that violate various engineering principles (banking, curve radii, etc.) and economics (never as cheap as they imagine).
But if you're goal is never to put forward a serious alternative but a strawman that can be used to justify cancellation of the other thing, it's fit for purpose.
There is, and it's still being developed. I'm not defending it since I haven't read what has been released, but I am confident the proponents aren't just tossing stuff out, which is what I think is happening with the 'use the existing CN corridor' crowd. For frequent train service that blends both express and local service, I guessing that a minimum of four tracks would be needed, and I have seen no indication that anybody has said there is a continuous ribbon of space in the existing CN corridor. If you view the corridor, it goes through every sizeable community along the way. That's not unusual; settlement generally followed the railway and lakeshore corridor has the added impact of being, well, the lakeshore, when both of the those corridors were the primary transportation methods. I would argue the cost and social impact of expropriation would be much higher than that of purely rural land.but there is for HSR? I can block of a 50 to 100 meter wide strip of land across the entire province that is totally inviolable but I can't use the same corridor, that permits controlled access via level crossings and gates. I am guessing that for most of the route from Oshawa through to Ottawa there is space on either side of the main lines that could be expropriated with far less impact on the community than the HSR. Then Ottawa can use their heavy-handed approach to telling either CN or CP that this is the way it is going to be; live with it.
One problem they would face in Alberta is similar to Ontario, in that underpasses to allow farmers to access now-severed parcels would have to be frequency enough so as to not add costs to the farmer and large enough to accommodate the equipment.the route is easier to map out without ripping up someone's farm. Quite conceivable to follow a section line for miles so it would be the back of two ranches. Fewer roads to cross as well. And yes the people fighting this are from the less populated areas. That's a given considering it is their homes you are bulldozing. Residents in the Golden Horseshoe could care less until they see the real bill. I doubt very much if the people on the designated route gave a positive response to the survey.
If you are talking pure HSR including kingston is dumb. Better to build a line Kingston Ottawa as a stand alone. There may even be room on one of the existing rights of way but regardless. There is no room in Kingston that I have seen so a separate facility would have to be built north of the 401 so residents are going to have a significant driving commute to get to the train anyway. Better to stay with what you have and go back to the Peterborough direct Ottawa. Far less population or working farms to move but a lot of rock and water. That Kingston line would not be HS. but it would be dedicatedMy favourite is the proposal - seriously put forward - that HSR could follow the 401 corridor.
There is, and it's still being developed. I'm not defending it since I haven't read what has been released, but I am confident the proponents aren't just tossing stuff out, which is what I think is happening with the 'use the existing CN corridor' crowd. For frequent train service that blends both express and local service, I guessing that a minimum of four tracks would be needed, and I have seen no indication that anybody has said there is a continuous ribbon of space in the existing CN corridor. If you view the corridor, it goes through every sizeable community along the way. That's not unusual; settlement generally followed the railway and lakeshore corridor has the added impact of being, well, the lakeshore, when both of the those corridors were the primary transportation methods. I would argue the cost and social impact of expropriation would be much higher than that of purely rural land.
One problem they would face in Alberta is similar to Ontario, in that underpasses to allow farmers to access now-severed parcels would have to be frequency enough so as to not add costs to the farmer and large enough to accommodate the equipment.
I think a Calgary-Edmonton HSR would be a good first test although, admittedly, it is not as far along as ALTO in its development. For a longer while, I think the province was pushing a Calgary-Banff corridor. Calgary-Edmonton is an ideal distance to go head-to-head with air travel and demonstrate saving some GHG. It would toss federal money at the west, doesn't have a provincial premier that is whinny about it and would be a good test for the proposed 'enhanced' expropriation rules in a fairly right-wing neighbourhood.
If Calgary-Edmonton HSR ever becomes a reality, it will run likely run right down the highway 2 corridor (which is already access controlled). I would also guess it will start and stop at YEG and YYC- both are on the city outskirts and in the case of YEG, the LRT is not actually that far away anymore with a plan to push it all the way in the next decade.Haven't driven there much have you/ On google maps you will see gridlines every mile. Only about 1 in 3 is actually active as a road with the rest being field boundaries left over from when quarters and sections measured a farm holding. Now that 6 and 10 sections can make up a property many of those roads have been integrated into the ranch itself serving as access routes to the back fields. Many of those remaining as roads have been truncated: they are dead ends or simply connect two adjacent Range Roads. If you chose carefully you could probably go 10 miles before you would need an underpass constructed and without having to divide a single holding.
My favourite is the proposal - seriously put forward - that HSR could follow the 401 corridor.
There is, and it's still being developed. I'm not defending it since I haven't read what has been released, but I am confident the proponents aren't just tossing stuff out, which is what I think is happening with the 'use the existing CN corridor' crowd. For frequent train service that blends both express and local service, I guessing that a minimum of four tracks would be needed, and I have seen no indication that anybody has said there is a continuous ribbon of space in the existing CN corridor. If you view the corridor, it goes through every sizeable community along the way. That's not unusual; settlement generally followed the railway and lakeshore corridor has the added impact of being, well, the lakeshore, when both of the those corridors were the primary transportation methods. I would argue the cost and social impact of expropriation would be much higher than that of purely rural land.
I think a Calgary-Edmonton HSR would be a good first test although, admittedly, it is not as far along as ALTO in its development.
Kinda speaks to the Dunning-Kreuger level confidence of the general public on most issues that should be left to the pros.
Same Dunning-Kreuger level of normal folk who had issues with some of the Ottawa LRT?
Pros though.....
Same Dunning-Kreuger level of normal folk who had issues with some of the Ottawa LRT?
Pros though.....
Interesting watch:
if you do it right the two should be interchangeable. Design the curves and stations for future light rail and then use trams until ridership dictates the other. Keep the trams for night ridership while you clean and maintain the trains. Lots of examples in Europe to show how it is doneLess pros than politicians.
The pros recommended building a smaller and robust system. I remember attending a public consultation in 2007 where Kinkisharyo (Japanese OEM) specifically called out using trams and said a city of a million people should build a light metro.
But since we had to put a tram in every pot, the only way to make a longer line that extended into the suburbs was to build a cheaper and lower capacity system. Hence trams.
By the way, the original plan was to run the Confederation Line at grade in Orleans and Kanata. The 2013 bus crash at Fallowfield killed that plan. But at that point, they had already committed to using trams. So they didn't backtrack. They simply spent more to grade separate the whole line. Which then led to not enough money to extend into Kanata and Barrhaven. These are all political choices to be clear.
Ottawa should be a case study in letting politicians and public opinion ignore professional advice. Want to see what happens when pros do work? Montreal REM. Cheaper than the Confederation Line. Fully automated. Climate controlled stations. But they didn't pander to every hood who wanted a stop. They built whatever they could inside the budget and refused to compromise.
if you do it right the two should be interchangeable.
Why is this channel all AI scripts about Canada and based in Morocco?
Depends what you design in the first place. Build 'em high or build 'em low; the factory doesn't care. The Confederation line is a Metro system as are all the rest of Ottawa's trams.And this is why pros should do this stuff.....
What makes you think trams and medium Metro trains (à la SkyTrain) are interchangeable when they are certified to different crash standards and operate at different platform heights?
All depends on your definition of a Metro train. 4 to 6 car trams running on discrete rails perform the same function as a Sky Train style conveyance. In a city of 1,000,000 i.e. Ottawa if you are not building a subway you might as well go for the enlarged tram as the distance between stations won't be long enough to generate any kind of speed. I consider a subway as a medium metro train. I put extended trams in the same category. And you don't have two distinct fleets; just different capacities. Same motorman runs both. Now that may not be your definition but Wilki et al agrees that it is any high speed transit system operating on a dedicated route so street cars/trams, subways, elevated systems are all metro trains. It is not confined to GO or Sky Train style concepts.And also why exactly would anybody build two separate systems or fleets for the same application? I would think a forum full of people who get why the RCAF shouldn't operate two fighter fleets would get why that same principle is true in other fleet applications.
4 to 6 car trams running on discrete rails perform the same function as a Sky Train style conveyance.