High Speed Train Coming?-split from boosting Canada’s military spending"

Even though they do get snow and ice, Europe doesn't seem to take it into consideration. Brussels for instance is quite hilly in places yet the trams are not equipped with sanders. Consequently service grinds to a halt with any accumulation until the tracks can be cleared.

Indeed. And if the politicians had listened to the professionals they wouldn't have situated the estimate which led to the poor outcome (and value for money) they got. Montreal's REM is just 200 km down the road. Started about the same time. And they built a substantially better service. Every time I'm freezing my ass off, waiting for the O-Train I think of how nice it would be to have a climate controlled platform..... Which OC Transpo is also discovering is something they should have had, as platform salting is eroding the platforms decades earlier than planned. You can see the rust.

Hopefully the designers in Alto think of these things although being from Europe they may have to be prompted.

There's a reason all three major Alto contenders were led by a European or Japanese rail builder or operators. In the case of the winning Cadence consortium, it includes various branches of the French operator SNCF. My confidence would be far lower if it was an all Canadian team. Sad to say.
 
The Globe and Mail

Published 5 hours ago
Updated 4 hours ago

Release of Alto’s revised high-speed rail corridor delayed until January
 
Indeed. And if the politicians had listened to the professionals they wouldn't have situated the estimate which led to the poor outcome (and value for money) they got. Montreal's REM is just 200 km down the road. Started about the same time. And they built a substantially better service. Every time I'm freezing my ass off, waiting for the O-Train I think of how nice it would be to have a climate controlled platform..... Which OC Transpo is also discovering is something they should have had, as platform salting is eroding the platforms decades earlier than planned. You can see the rust.



There's a reason all three major Alto contenders were led by a European or Japanese rail builder or operators. In the case of the winning Cadence consortium, it includes various branches of the French operator SNCF. My confidence would be far lower if it was an all Canadian team. Sad to say.

I'd settle for platforms that are a little more enclosed or at least a better attempt at keeping the wind under control.

uOttawa and especially Hurdman immediately come to mind. 🥶
 
Back