• Thanks for stopping by. Logging in to a registered account will remove all generic ads. Please reach out with any questions or concerns.

Search results

  1. B

    Canadian modular assault rifle project, a C7 replacement?

    Phase 1 is for the delivery of the General Support variant - presumably, lower-pressure barrels are considered acceptable for that variant when trading delivery timelines for capability. Earlier commentary somewhere on Noah's site (?) indicated that Colt needs a few years to replace the current...
  2. B

    CAN-led MN Bde (formerly eFP BG) Latvia Megathread

    $0.02: I saw widespread coverage on the mainstream news here - Global, CTV, CBC Edmonton evening news all ran 60-90 second spots plus I saw it on the national outlets' evening shows. Given the lack of details available, I thought the coverage was extensive.
  3. B

    How To Get EU Citizenship, Country By Country

    As an Albertan contemplating the (hopefully unikely) scenario of needing to relocate after a herd of idiots vote for separation, the EU would be a nice option to have tucked away.
  4. B

    New Canadian Shipbuilding Strategy

    His time in that role is nearly up though, isn't it? IIRC he rotates out in the next year or so - May 2027 would be five years for him. He made some remark regarding his TBD successor in some video clip I saw but cant remember which one. Does anyone know if profound (apparent) competence...
  5. B

    Continental Defence Corvette

    Noah strikes again ... Ontario Shipyards shows off new look at Vigilance 100 https://noahscornerofrandomstuff.substack.com/p/ontario-shipyards-shows-off-new-look
  6. B

    Status on Victoria-class Submarines?

    The Fall 2025 edition of the RCN Maritime Engineering Journal has an excellent article on the new bow sonar array for the four Victoria class submarines. This represents one of the 13 individual projects that comprise the Victoria-class modernization project which will maintain their...
  7. B

    RUMINT of Canada wanting more C-17's

    Or, just to step outside the conventional resourcing/tasking box ... how about dual-use lifters - alternating between RCAF in the spring and winter, and a national fire-fighting airtanker fleet in the summer and fall ??
  8. B

    Indirect Fires Modernization Project - C3/M777 Replacement

    Interesting remarks on the General Atomics LRMP (long-range maneuvering projectile though no word on any impact to warhead size. https://nationalinterest.org/blog/buzz/general-atomics-may-have-just-revolutionized-cannon-bw-101825
  9. B

    Canada's tanks

    Interesting article in this summer's edition of 'Canadian Army Today' magazine on the centralization of the tank force in Edmonton: Tank Centralization: A bridge to the Army’s future armoured capability | Canadian Army Today The last paragraphs look forward to ongoing and possible future...
  10. B

    Replacing the Subs

    Well, it probably helped that 11 worker deaths during construction was considered acceptable and the ongoing Great Depression meant major infastructure initiatives moved quickly across the US
  11. B

    CH-148 Cyclone Progress

    I think Carney would have no problem driving the rhetorical bus over Liberal PMs past (again - e.g. consumer carbon tax) if this ever escalates to the PM's office.
  12. B

    Indirect Fires Modernization Project - C3/M777 Replacement

    Not sure if everyone would have seen this yet ... https://army.ca/forums/threads/army-ca-costs-and-funding.151259/
  13. B

    Official Army.ca Costs and Funding

    have signed up as benefactor. Am "just" an interested civvie but love the site!
  14. B

    Arctic/Offshore Patrol Ship AOPS

    Interesting snippet from the Fall 2024 edition of the RCN's Maritime Engineering Journal - progress towards implementation of air capabilities: The completion of its first short work period on HMCS Max Bernays (AOPV-432) through May and into early June. AJISS, or the Arctic Offshore Patrol...
  15. B

    Replacing the Subs

    And the galley, hopefully!
  16. B

    AOR Replacement & the Joint Support Ship (Merged Threads)

    Two years? The article states "Exactly 48 months after the first steel was cut, the ship successfully completed its maiden sea trials in December 2024." Further, the construction approach is very different from that specified by Canada - this hull was constructed and outfitted outside of the...
  17. B

    New Canadian Shipbuilding Strategy

    I just ma Well, Davie owns a Finnish shipyard (since 2023) that specializes in icebreakers. If it genuinely was vital to our nation's strategic interests to advance warship construction in the near term, we could at least consider a scenario where some of the icebreaker work is offshored to...
  18. B

    New Canadian Shipbuilding Strategy

    Plan, yes. Communicate to the masses, no.
  19. B

    New Canadian Shipbuilding Strategy

    Or pull a page from the Donald's playbook and make them an offer they can't refuse - change the limit or else. I'm sure there's a piece of legislation somewhere that allows for extreme measures in time of national emergencies. If we're unable to rationalize that today in the face of threatened...
Back
Top