PRO delivery to navy summer 27', which will be after builders trials. Then ship will be transferred to Victoria Shipyards to install some of the combat systems as Vancouver shipyards doesn't have the expertise.
It won't be till probably late 28' the PRO is fully approved for every task. Warm/cold water trials, a whole bunch of flight operations tests/trials. Baselining all the comms systems, EW systems, learning how to properly load and store everything, fueling transfer, pumping systems, DC systems, cranes, boats, ammunition transfers... so much stuff.
Preserver is already ahead of schedule and Protecteur is behind schedule. As is always the way with ships. First one lags, second one goes faster.