There was an incident a while back where a hole was made in drywall during a mess event, and now the time has come to fix the damage. We are in a heritage building, so obviously PWGSC has to be involved and it cannot just be fixed by one of the numerous general contractors, drywallers, or civil engineers within the unit. The hole would require two sheets of drywall to be replaced, and PWGSC's quote totaled $2600. We asked for an itemized quote, and magically the total jumped up to $3100, of which $2600 was "disbursements". Naturally, this did not pass the sniff test from the many engineers and contractors that we have. Their estimate (and remember, these are their trades) was that it was a $500 job. Despite trying to be fiscally responsible, the unit authorized the repair (at $3100), issued a fin code, and essentially ordered us to pay for it with our mess money (non public funds).