• Thanks for stopping by. Logging in to a registered account will remove all generic ads. Please reach out with any questions or concerns.

High Speed Train Coming?-split from boosting Canada’s military spending"

Bro! Come on lol This is so much cope; I could cut it with a knife!

We agree on a lot of other things so I am going put an offer out there for you.

Next federal election come out and spend he night at my place. We will watch the election unfold. I don't care about the outcome; but I want you to observe and tell me what starts to happen when the Que and Ont polls close and report in.

I will provide all the food an drink you'd like. Lobster and NS Moonshine!
Pffft you guys are already in bed by the time we get to see our poll results.
 
You're right. Disingenuous is more accurate given the math that follows.



Why? The larger town is Belleville.



Go look up how many 2:45 scheduled trips there are per day between Belleville and Ottawa. Using the 1-2 express trains per day and your best case scenario is already well over 3 hrs. In reality, VIA almost never hits that timing and all their other schedules are over 3 hrs.



Why is there a 30 min wait for an hourly service? Do people arrive half an hour before a GO train in Toronto? I don't even arrive half an hour before VIA today. And in some places with HSR you don't even get platform access until 10-15 mins before departure.



We didn't spend $10B to service one hypothetical rider from Trenton. Do you get why I see this kind of crap as dishonest and disingenuous?



They are planning for hourly frequency off peak. And half hourly at peak. That's kind of the point of having your own tracks. You can run as many trains you want, as fast as you want.



You mean the kind of dedicated track that Alto is proposing to build? Any dedicated track that has to service even more stops would actually be even more disruptive on construction and expropriation than what is being proposed today.
but the military is in Trenton and I was starting from home plate. And we drove from Trenton to Belleville, remember? Regardless of the type of train you have to come from somewhere to get where the train is. You didn't read a damn thing did you? 30 minutes was for traffic lights and other unexpected delays. Only idiots arrive at 2:59 for a 3 oclock departure. If it is a dedicated line, as stated, 2:45 is quite doable, in fact that leaves time for stops in Brockville and Smith Falls to accommodate another group of Canadians. Of course you didn't spend 10 billion or whatever for one rider, you spent all that cash to save less than 30 minutes but I wouldn't expect you to have figured that out. Byte
 
My opinion, and it is just that. The only real reason a few on here are screaming high approvals for such a massively expensive (and not needed) Alto HSR project is because you want to show unwavering loyalty and devotion to PM MC and the LPC. Go ahead, convince me otherwise.

When I hear many a former Liberal and Liberal voters (for now, maybe not much longer) standing up and saying they are dead against this, that peaks my interest.
 
My opinion, and it is just that. The only real reason a few on here are screaming high approvals for such a massively expensive (and not needed) Alto HSR project is because you want to show unwavering loyalty and devotion to PM MC and the LPC. Go ahead, convince me otherwise.

When I hear many a former Liberal and Liberal voters (for now, maybe not much longer) standing up and saying they are dead against this, that peaks my interest.

Unfortunately the rural folks this will directly affect are sacrificial for the urban vote rich locations.

They are obviously hayseed hillbillies, and probably not true Liberals anyways, who don't know better and how great this will be for Canada.

Look I'll never use the damn thing. But it's going to trample over land that is owned by family and friends and it's going to cost me tax dollars.
 
not really, we are not as stupid as you seem to imply. Let's start from Trenton. 15 minutes to Belleville, 30 minutes (excessive but don't want to worry about red lights) 2:45 (scheduled time) Belleville to Ottawa. That's VIA. HSR is as follows: Trenton Walmart to Kingston VIA station by car is 1:05. Using the same 30 minute wait is 1:35. HSR to Ottawa is roughly 45 minutes using the current station. So travel time is 2:20. You saved less than half an hour, still spent an hour in your car and it cost you probably 10 billion dollars. The idea of an HSR is cool but it would be a total waste of money without the frequency of service that they talk about. Slow it down a little, go for the 2:45 time only on a dedicated track, save half of the costs (at least) and go dedicated VIA only with the frequency of HSR. Nobody will notice it is a little slower, honest but they will be delighted to be able to start in Belleville.
Is anyone suggesting the business case of HSR is built on time savings in travel between Trenton and Ottawa? That seems like an example deliberately picked to be as marginal as possible.
 
Is anyone suggesting the business case of HSR is built on time savings in travel between Trenton and Ottawa? That seems like an example deliberately picked to be as marginal as possible.

That's a solid question. But is the juice worth the squeeze?

How much will this cost, over what time period and how long before the overhead is covered and it's starts actually producing money for the Gov ?
 
Slow it down a little, go for the 2:45 time only on a dedicated track, save half of the costs (at least) and go dedicated VIA only with the frequency of HSR
There is no study that I am aware of that shows there is continuous space in the current CN Kingston subdivision for at least two dedicated tracks. Even if there was, VIA is still a tenant and subject to CN's dispatching, train routing, track maintenance priorities, etc.
 
That's a solid question. But is the juice worth the squeeze?

How much will this cost, over what time period and how long before the overhead is covered and it's starts actually producing money for the Gov ?
Dunno. I’m not particularly engaged in this one, I’m mostly just watch and see how this plays out. I will be interested to see the more fleshed out business case and costing estimates.

There are lots of people on the internet who really like trains, so I think we’ll keep hearing about this for a while.
 
There is no study that I am aware of that shows there is continuous space in the current CN Kingston subdivision for at least two dedicated tracks. Even if there was, VIA is still a tenant and subject to CN's dispatching, train routing, track maintenance priorities, etc.

All of these alternative proposals are based on fantasies that violate various engineering principles (banking, curve radii, etc.) and economics (never as cheap as they imagine).

But if you're goal is never to put forward a serious alternative but a strawman that can be used to justify cancellation of the other thing, it's fit for purpose.
 
Dunno. I’m not particularly engaged in this one, I’m mostly just watch and see how this plays out. I will be interested to see the more fleshed out business case and costing estimates.

There are lots of people on the internet who really like trains, so I think we’ll keep hearing about this for a while.

There's plenty of history we can see from every other country that built HSR. First phase? Insane opposition. Mostly rural. Fiscal conservatives complaining that this will bankrupt everyone. As soon as it starts rolling though? Everybody wants extensions. You'll find examples in several countries where staunch opponents in Phase 1 then campaign on getting extensions to their city/region/etc.
 
Back
Top