Just to clarify an earlier error by someone (cannot recall who). Shipboard RODs cannot make water while alongside IAW Naval Engineering Manual. This has been argued many times with Ottawa (you know, the place with NO NAVY) to no avail. The original manufacturer (Zenon) had even stated in the past that they could be utilized alongside or in coastal outfalls with an increase in Bromine injection but the bean-counters say no.
I was CERA on HAL during that 2007 GLD someone mentioned and I was still fighting about this long after that trip was over - and why you say - This deployment is ``the`` perfect example. If 2 RODS were running (albiet working perfectly), IRO and HAL class could produce in excess of 70 tonnes a day with ships crew (with pusser showers) only needing about 10-12 of that. I would say then, in a perfect world, these vessels should be ideally suited to this type of deployment.