High Speed Train Coming?-split from boosting Canada’s military spending"

The Globe and Mail

Published 5 hours ago
Updated 4 hours ago

Release of Alto’s revised high-speed rail corridor delayed until January
 
Indeed. And if the politicians had listened to the professionals they wouldn't have situated the estimate which led to the poor outcome (and value for money) they got. Montreal's REM is just 200 km down the road. Started about the same time. And they built a substantially better service. Every time I'm freezing my ass off, waiting for the O-Train I think of how nice it would be to have a climate controlled platform..... Which OC Transpo is also discovering is something they should have had, as platform salting is eroding the platforms decades earlier than planned. You can see the rust.



There's a reason all three major Alto contenders were led by a European or Japanese rail builder or operators. In the case of the winning Cadence consortium, it includes various branches of the French operator SNCF. My confidence would be far lower if it was an all Canadian team. Sad to say.

I'd settle for platforms that are a little more enclosed or at least a better attempt at keeping the wind under control.

uOttawa and especially Hurdman immediately come to mind. 🥶
 
Who has the salt contract for Ottawa? I swear they put about a foot of that shit on the platform when it gets a little cold out.
 
Indeed. And if the politicians had listened to the professionals they wouldn't have situated the estimate which led to the poor outcome (and value for money) they got. Montreal's REM is just 200 km down the road. Started about the same time. And they built a substantially better service. Every time I'm freezing my ass off, waiting for the O-Train I think of how nice it would be to have a climate controlled platform..... Which OC Transpo is also discovering is something they should have had, as platform salting is eroding the platforms decades earlier than planned. You can see the rust.



There's a reason all three major Alto contenders were led by a European or Japanese rail builder or operators. In the case of the winning Cadence consortium, it includes various branches of the French operator SNCF. My confidence would be far lower if it was an all Canadian team. Sad to say.

I'd settle for platforms that are a little more enclosed or at least a better attempt at keeping the wind under control.

uOttawa and especially Hurdman immediately come to mind. 🥶

Just me over here pining for the mid to late 2000s, commuting from Orleans to school when we had a solid 7/10 transit system…
 
I'd settle for platforms that are a little more enclosed or at least a better attempt at keeping the wind under control.

uOttawa and especially Hurdman immediately come to mind. 🥶

This is why I say the Dunning-Kreuger of the average voter and politicians. They look at enclosed platforms and think it's a luxury that broke ass transit users don't "deserve". Because let's be honest, in Ottawa, they think of public transit as something for students, the poor and 8-4 Public Servants. An actual transport professional looks at it from a systems approach and argues that enclosed platforms reduces station maintenance, reduces track incursions and improves overall reliability.

Just me over here pining for the mid to late 2000s, commuting from Orleans to school when we had a solid 7/10 transit system…

You're forgetting the bus parades in the core. I remember sitting on a bus taking 30 mins from Parkes till Hurdman. I remember attending one of the LRT consultations where somebody in the audience asked why any of this was needed because in his words, "Trains are for big cities." It's a weird culture quirk that people in Ottawa think of the place as small. That bus system was already running beyond capacity back then and was insanely expensive to run with one driver and bus for 70 riders.

The politics is interesting here too. Aside from the LRT in every pot demand by Ottawa which substantially diluted the rail service, they also resorted to substantial austerity on transit and were happy to let people blame the LRT when so much of the crap was the underfunding of the bus system. In 2010, OC Transpo had 1030 buses. They were down to 920 when the Confederation Line opened. They are under 800 today. In essence, OC Transpo got forced to cut the bus fleet before the rail system was matured and reliable. And never developed the high frequency feeder service that should complement a rail system. And their new plan is to cut the fleet to 700 by the end of next year, before Confederation Line West is even open.

Contrast this to say the inner suburbs of Toronto where a lot of TTC feeder services run at 10 min frequency or less. And even off-peak a lot of suburban services are at 15 mins.

PS. I didn't care about any of this stuff. You know what got me going to transit consultations as a twenty something newly posted to Ottawa? Sitting on a bus averaging less than 5 kph.
 