• Thanks for stopping by. Logging in to a registered account will remove all generic ads. Please reach out with any questions or concerns.

Canadian River Class Destroyer Megathread

I'm going to beat this drum, and I really hope that we've learned a lesson with the implementation of the National Shipbuilding program. But in 1998 we had a worked up shipyard with workers churning out Frigates at a furious rate. The last ship was leaving and we knew, WE KNEW that our supply ships were nearing end of life, that the Coast Guard and DFO ships were facing rust out and that within 10 years the Trumped Destroyers were going to roll over and sink. And we shut the whole operation down.
We now have the NSP and after rebuilding an industry 4 times (WWII, the 50's, the 80's, and now) over the last 100 years I really hope we've learned a lesson and that do the following:
1 - The design life of a warship is 25 years - stick to it;
2 - The GoC is planning for the current program's replacements, and thinking about what will replace them as well;
3 - The shipyard workers are a strategic resource and we must do what is required to keep them employed; and
4 - Send Donald Trump a fruit basket for kicking this nation in the crotch to shake it from its comfort zone and start to act like a goddamn grown-up.
 
Yes, we've all been reading about it now.

Realistically if they chose a shipyard (can't see how it could be either Seaspan or Irving) by say Aug of 2028, after wrapping up the current stage by end of Dec of 2026. If first steel is cut by Nov of 2029, the first boat could be commissioned and accepted by the RCN by what, 2035? Maybe the 2nd boat by 2036?

Does that help us in staving off what the RN is now experiencing?

Are those 'thrown against the wall' dates even feasible?

Which shipyard or combination of shipyards could realistically meet the above timelines?
Irving and/or Seaspan can do the design work and help with the setup as well. There is starting to be pushback on BC Ferries getting vessels from overseas as well. Perhaps a spinoff of the NSS is a civilian version building ferries and other vessels, with import taxes to make them competitive with foreign built vessels?
 
Question: Can the River-class navigate the St Lawrence Seaway? The specs look a bit tight to me.

:unsure:
 
They can. But for purposes other than PR, why would they?
Rush-Bagot aside, I was contemplating having hybrid CDCs go on the Great Lakes and St Lawrence for NavRes training. That made me think about the RCDs - which I do not consider a NavRes friendly ship to start with. I looked at the Seaway specs and the beam and particulalry the draft looked a bit too close.

🍻
 
Rush-Bagot aside, I was contemplating having hybrid CDCs go on the Great Lakes and St Lawrence for NavRes training. That made me think about the RCDs - which I do not consider a NavRes friendly ship to start with. I looked at the Seaway specs and the beam and particulalry the draft looked a bit too close.

🍻
That's what the FASST-V program is for (Future At Sea Sovereignty and Training Vessel). Basically better Orca class. Longer, better seakeeping, ability to take crew served weapons (50 cal, C6) secure comms etc...

Also expecting an RFI this year. There is a good chance that it will be released ahead of CDC as I'm unsure as if CDC is on as fast of a clock.

Right now all the main yards are pretty full. Seaspan has at least 12 years of work on the docket, Irving has 15 years of work. Davie no idea but they seem more interested in expanding their international empire. FASST-V will go to a smaller (or multiple) smaller shipyards. Expected to produce 15+ vessels (I've heard as high as 30 and as low as 12).
 
They can. But for purposes other than PR, why would they?

Years ago a DDH-280 went up the St.Lawrence Seaway to a drydock in Port Weller Ontario (by St.Catherines).

I wonder if it's big enough for a RCD to fit (if that dry dock is still in operation)? I believe it big enough in terms of length and width (much bigger than RCD), but I am not so sure about depth. Would that dry dock, if operational (or if not operational then restored), be deep enough for an RCD?

All very very hypothetical of course ... and I don't know the status of the Port Weller/St.Catherines dry dock. I read the "historic company" that once ran that dry dock was Port Weller Dry Docks (founded by Charles Ansell in 1946). It was later owned by Upper Lakes Shipping/Upper Lakes Group and operated under names including Seaway Marine & Industrial. After that company’s 2013 bankruptcy, Heddle Shipyards took over operations under a long-term lease; where I believe it is now listed as a facility of Ontario Shipyards. But I don't know if it is operational.
 
Back
Top