- Reaction score
- 6,336
- Points
- 1,090
The CAAM (Sea Ceptor) will be launched from a six ExLS grouping just aft of the main stack on the fwd top of the modular mission space. As they are quad packed it means 24 Sea Ceptor. So add that to the math.Thumper81 said:Well damn. You could have 28 SM-2's and 16 ESSM's
Of course, the loadout will vary based upon the role, mission and whatever the warfare centre models as the best mix based on the threat of the day.
So odd thought given the timing of the sudden influx of CSC info after a long time of silence. The parliamentary budget committee started examining the CSC program before the pandemic. Bets on that report is about to come out?