I only see a reduction in RCD's if they have something else to replace them with, so perhaps 6x RCD, 6x Frigate of some type and unknown number of CDC's

Germany and GBAD, did I miss something?Huge CMS 330 contract with Germany.
Huge sumbmarine contract with Germany.
Canada partnered with Germany on GBAD.
See the pattern?
Nevermind, that was Lockheed Martin US. Partnered with Diehl on PAC-3s.Germany and GBAD, did I miss something?
...A key feature of the design is its integration of U.S.-sourced combat systems and sensors. Rheinmetall says the frigate is designed around the AEGIS combat system and can accommodate multiple U.S.-sourced radar options capable of detecting, tracking, and engaging conventional air threats, hypersonic weapons, and ballistic missiles.
For customers seeking an alternative combat management architecture, the company says the GMF 140 can also be configured with Lockheed Martin’s CMS330 combat management system, providing an open and scalable architecture capable of integrating both U.S. and European sensors and weapons.
....In terms of size and capability, the GMF 140 sits squarely in the same category as the now-canceled U.S. Constellation class frigate, British Type 26, and the Franco-Italian FREMM, but with a different emphasis.
....Rheinmetall’s reference to a procurement project in North America is interesting, pointing to either Canada or the United States.
As it stands, Canada has already selected the River class destroyer (based on the Type 26), so Rheinmetall would be relying here on a future tranche or a follow-on requirement.
----In the United States, the Constellation class frigate program was terminated last year, and it was announced that the National Security Cutter design will serve as the basis of a new U.S. Navy frigate program that is named FF(X). Introducing an entirely new design into that program would seem highly unlikely, but the appearance of the GMF 140 does suggest that Rheinmetall has identified a gap in the market between the new FF(X) and the Arleigh Burke class destroyer, with a VLS capacity and level of capability matching that.
Would you rather see 3 less Rivers but 2-3 more CDC’s and 2-3 more subs?
Speaking of the F127, maybe we should join in on that for four or five, or more. By size and AAW role, it would probably have to be designated a cruiser.Their choice of combat system makes sense because that's the same system going on the Type 127 frigate (the 12000 ton air defence monstrosity) and NVL has a place in that program. Its going to be a US radar with AEGIS and CMCMS330.
I see the logic in that.I'd sacrifice 2 rivers for 2 more JSS.
I don’t.I see the logic in that.
Yes, I understand that as well - 9 and 6 across the 2 coasts.I don’t.
The number “15” for RCDs is not plucked out of thin air. There is real, actual operational research behind it, based upon our operational tasks.
For once, let’s do things properly.
I don’t.
The number “15” for RCDs is not plucked out of thin air. There is real, actual operational research behind it, based upon our operational tasks.
For once, let’s do things properly.
I keep hearing that 2 more AORs will be ordered in the early 2030s. When we have the fleet size and the crewing available to justify two more.That's fair. Why do we have to trade ? 15 RCDs and 4 JSS is the best option IMHO.
Perhaps we're too used to having to compromise.
I believe and hope that will happen if we get our 15 RCDs and a limited amount of CDC. AOPV's are not factored in to that as that class will probably not RAS anymore.I keep hearing that 2 more AORs will be ordered in the early 2030s. When we have the fleet size and the crewing available to justify two more.
2026
2027
2028
2029
2030
2031
2032 - Delivery of RCD 1
2033 - Delivery of CPS 1 and 2
2034 - Delivery of RCD 2 and delivery of CPS 3 and 4
2035 - Delivery of RCD 3
2036 - Delivery of RCD 4
11 more RCDs by 2050
8 more CPS by 2040??
When will we be able to sustain a modernized task force?
What will the battlespace look like then?
It takes time to build modern warships. Thankfully the ball is now starting to roll.
Perhaps add:
2027 - JSS - Future HMCS Protecteur
2028 - JSS - Future HMCS Preserver
... and frankly IMHO we need more than just two JSS. ... Not to mention a mobile base ship (or two) for the Arctic and the corvettes
The Canadian Coast Guard is now under DND. I think :
2026 (late) - AOPS-7 CCGS Donjek
2027 - AOPS-8 CCGS Sermilik
... and ...
2030 - Heavy Ice breaker CCGS Arpatuuq
2032 - Heavy Ice breaker CCGS Imnaryuaq
....
I think Coast Guard is also trying to procure 6 medium-to-large icebreakers ? and 16 smaller boats to replace other small boats in their aging fleet
... but i could have those wrong.
I am curious how much movement there will be on any Continental Defence Corvette, and the delivery timelines, plus of course, schedule for more JSS and mobile base ship(s).
At present it all seems to be very far off - which I think is the point you make ..... Perhaps the 'upside' (if one can call it that) is it gives the RCN sometime to work on addressing its serious manpower shortage.
.
quwa.org