I'll believe it when I see it.
They aren't doing it for drones. They are pursuing that for missile defence. There's a difference.
You can literally read the order here:
![]()
The Iron Dome for America
By the authority vested in me as President by the Constitution and the laws of the United States of America, including my authority as Commander in Chiefwww.whitehouse.gov
LAV700 incoming?![]()
General Dynamics to Ottawa: We need more military orders or risk layoffs
London’s military armoured vehicle maker is lobbying the federal government for orders, citing layoffs without new work.lfpress.com
LAV700 incoming?
Some of the RegF's LAVs are pretty haggard atm anyways. We'd all much rather something tracked at that weight class but if that's what it takes to get AFVs with more modern armour, more power and integrated missiles, better than nothing. I wish we had Lynx or CV90 as much as the next crewman but we have to be realists here.
I imagine BAE won't license CV90 to GDLSC eh?They are completely worried about us going with some European competitor.
A couple of squadrons of A1s would do the job nicelyStill cheaper than a Patriot![]()
Medium calvary vehicle project is listening...LAV700 incoming?
Some of the RegF's LAVs are pretty haggard atm anyways. We'd all much rather something tracked at that weight class but if that's what it takes to get AFVs with more modern armour, more power and integrated missiles, better than nothing. I wish we had Lynx or CV90 as much as the next crewman but we have to be realists here.
All of these things pulls more and more projects away from what we can buy from the Euros. The number of possible projects that we can do with them, in order to be allowed into their defence spending program, boils down to possibly some French fighters, the arty/mortar RFI, helo’s and maybe tanks. I think the subs will go SK. Outside shot for the Corvettes to be a Euro/CDN project.This is also the same noise comming from Seaspan. "If we don't get a new ship design project in the next 18-24mo we'll have to lay off the hard won design expertise we developed over the last 10 years".
I suspect that there will be an order for both GDLS and Seaspan.
We can have them do some designs, but not build them. Even offer to design stuff for our allies like Chile and Philippines.This is also the same noise comming from Seaspan. "If we don't get a new ship design project in the next 18-24mo we'll have to lay off the hard won design expertise we developed over the last 10 years".
I suspect that there will be an order for both GDLS and Seaspan.
I get the whole "Trump and USA Bad" thing but I'd still say a Canadian-built US product is better than a foreign-built European product where all the money flows out of the country.Uunfortunately heavily ITARed track.
As you noted there are lots of vehicles required but I'm willing to bet that with all the other MASSIVE spending commitments the CAF has (NORAD modernization, River-Class, P-8's, F-35's, submarines, HIMARS, SP Artillery, AD, multi-mission corvettes, AT, comms upgrades, satellites, tanks, munitions, not to mention infrastructure upgrades and spending to resolve recruiting and retention issues) that replacing the LAVs with a tracked vehicle will be far, far, FAR down the list.There are numerous more vehicles we need. For a start AD like M-SHORAD. Mortars under armour. More OPVs. More ACSVs like MRTs, engrs and Ambulances. Then add on a tracked family based on the ASCOD/AJAX family - lets say four battalions for starters. We can keep these folks working for decades and still not fill the need.
![]()
I know it had teething problems but the AJAX is so cool. That caseless ammo is amazing. I suspect that a we would probably go with a different turret design though.There are numerous more vehicles we need. For a start AD like M-SHORAD. Mortars under armour. More OPVs. More ACSVs like MRTs, engrs and Ambulances. Then add on a tracked family based on the ASCOD/AJAX family - lets say four battalions for starters. We can keep these folks working for decades and still not fill the need.
![]()
Is there room within any of the developing defence arrangements to line the designers up with foreign work?This is also the same noise comming from Seaspan. "If we don't get a new ship design project in the next 18-24mo we'll have to lay off the hard won design expertise we developed over the last 10 years".
I suspect that there will be an order for both GDLS and Seaspan.
I'm partial to Moog turrets.I know it had teething problems but the AJAX is so cool. That caseless ammo is amazing. I suspect that a we would probably go with a different turret design though.
The RIWP turret is super interesting. Modularity done right. XM914/M230LF and Javelin would be darn effective.I'm partial to Moog turrets.
![]()