except you need to do a Pickering and buy all the land now and that will cost.

Okay? Building anything involves some cost.

But they've explained in their open houses and other discussions that construction is phased and so are pre-construction activities. Toronto-Ottawa starts few years after Ottawa-Montreal. And Montreal-Quebec city a few years after that. Land assembly is similarly phased. Not in the least because they also want to use what they learn from Ottawa-Montreal to minimize expropriation as much as possible.
 
Okay? Building anything involves some cost.

But they've explained in their open houses and other discussions that construction is phased and so are pre-construction activities. Toronto-Ottawa starts few years after Ottawa-Montreal. And Montreal-Quebec city a few years after that. Land assembly is similarly phased. Not in the least because they also want to use what they learn from Ottawa-Montreal to minimize expropriation as much as possible.
Wouldn't you be financially better off buying now. If that first leg goes in and is successful and the succeeding government still wishes to go ahead with it (not guaranteed) the land will cost more than waterfront in Muskoka.
 
Wouldn't you be financially better off buying now. If that first leg goes in and is successful and the succeeding government still wishes to go ahead with it (not guaranteed) the land will cost more than waterfront in Muskoka.

You're assuming cost is the sole consideration. It isn't. Minimal impact on those communities is the consideration. As such, everything they do is geared towards that goal.

I wouldn't be worried about property prices. To my understanding the expropriation processes pay far market value. And Alto has repeatedly said they will compensate business and community impacts over and above land value. People can try and ask exorbitant prices, but I am fairly sure any judge will dismiss that.

For now though, it's why Alto has been somewhat secretive on the exact routing. They don't want a speculation frenzy. But once the first phase starts, there's less risk of that. And really, the largest speculation risk is on areas around or near stations. Not so much random field that would have track running through it.
 
HFR got canned because it failed. When VIA's previous CEO proposed it, there was almost no analysis behind it. It was originally supposed to be a $5B project that was supposed to be faster than anything today. They even said Toronto to Montreal via Ottawa in 4 hrs. Then they got engineers in to do preliminary design work and take soil samples, etc. Eventually, they figured out the cost was going to be $20B and it would still take 5 hrs from Toronto to Montreal (vs 5.5 hrs today). Physics is a bitch like that.

When Alto was bid out, the government even left the exact routing and station locations open. Any company could bid any route as long as they hit the cities on the list. There was a hope that maybe one of the freight cos might see value in moving freight to another corridor and selling their Lakeshore Corridor for passenger service. That didn't happen. And the winning bidder (Cadence consortium) basically turned the old HFR route into one of two options (it's the Northern route). A good chunk of the cost increase of Alto comes from added scope. Notably the several hundred kilometers between Montreal and Quebec City.
Good context thanks. That being said, I'm still sceptical about making the leap from the limited inter-city rail culture that we have all the way to HSR. I like rail and I like the idea of HSR and certainly have enjoyed being able to travel around France on their network. But even though the Windsor-Quebec corridor is the most densely populated area in Canada it's still a far cry from the population density of central Europe or Japan. And we have been so committed to road and air travel for so long now that getting people to switch is going to be tough. From where I sit in the east end of Ottawa I'm on the island in less than two hours. Taking the train, which I used to do for business all the time, involves driving or being driven into town to the station and then back again when I return, plus the two hour train trip. I just don't know that the increase in speed over what ever portion of the route between Ottawa and Montreal the train can actually travel at high speed is going to make it more convenient for me. But that's me.
 
There was a recent story about the Ontario Line in 2019 being quoted at
$10.9b and current projected cost $34 b.

Alto is quoted at $60b. A safe estimate is it ballooning to $180b - $240b.

(Or $44.6trillion using Liberal ArriveCan math)
 
You're assuming cost is the sole consideration. It isn't. Minimal impact on those communities is the consideration. As such, everything they do is geared towards that goal.

I wouldn't be worried about property prices. To my understanding the expropriation processes pay far market value. And Alto has repeatedly said they will compensate business and community impacts over and above land value. People can try and ask exorbitant prices, but I am fairly sure any judge will dismiss that.

For now though, it's why Alto has been somewhat secretive on the exact routing. They don't want a speculation frenzy. But once the first phase starts, there's less risk of that. And really, the largest speculation risk is on areas around or near stations. Not so much random field that would have track running through it.
In my rural village in the east end of Ottawa there are a lot of "no Alto" signs and the farmers around here are pretty staunchly against it. The CN right of way runs between us and the 417 and right along the southern edge of the village is the Prescott-Russell rail trail extension, which runs on what is still a right of way owned by VIA. So a lot of folks are worried about the potential for Alto see that as a viable option. Frankly I think that's doubtful. It was a single line and it is now so close to built up areas that I would imagine the environmental assessments would rule it out running so close to the community. I emphasize with the farmers but I think we're a long way from knowing just how Alto would work to mitigate and compensate for impacts on their land. Personally, I'm not worried about my property value.

That being said, I do think Alto and the government haven't done a very good job of controlling the narrative. Nor have they helped themselves by denying to our Councillor that they were responsible for marking showing up on the roads around us and then fessing up that while it wasn't them it was a subcontractor doing survey work. That just feeds into trust issues.

There is a political calculus as well that the Feds will have to account for. All lot of the stop Alto signs that are popping up on people's front lawns are from the Ontario Landowners Association, a group not know for it's love of Liberals. Last year, with provincial and federal elections just a month or so apart this riding went Tory provincially and Liberal federally. It wouldn't take much to have it go completely blue.
 
There is a political calculus as well that the Feds will have to account for. All lot of the stop Alto signs that are popping up on people's front lawns are from the Ontario Landowners Association, a group not know for it's love of Liberals. Last year, with provincial and federal elections just a month or so apart this riding went Tory provincially and Liberal federally. It wouldn't take much to have it go completely blue.
Much as I think this train is a huge boondoggle that will saddle our kids with even more outrageous debt, I DO NOT want any Govt making decisions on infrastructure based on how the next election might go. Do what's good for Canada, not any political party future.....
 
There's a crass political calculus on top of everything - are there more votes from "Canadian workers. Canadian steel. Canadian rail." than from the Ontario Landowners Association, and where are those votes located (Hamilton and the Soo).
 
There's a crass political calculus on top of everything - are there more votes from "Canadian workers. Canadian steel. Canadian rail." than from the Ontario Landowners Association, and where are those votes located (Hamilton and the Soo).
true however building a separated VIA would use the same steel. I too enjoy the train, its comforts and being able to watch the country go by at my leisure. When I travelled to Ottawa from Toronto having the time to unwind and prepare for the meetings ahead was priceless. I know from experience that there is very little sight seeing from HSR: damn thing moves to fast. My preference and for less money would be a properly built and segregated rail system. With that notion probably out the window I just hope that they do it right and can attract enough riders to justify its construction.
 
true however building a separated VIA would use the same steel. I too enjoy the train, its comforts and being able to watch the country go by at my leisure. When I travelled to Ottawa from Toronto having the time to unwind and prepare for the meetings ahead was priceless. I know from experience that there is very little sight seeing from HSR: damn thing moves to fast. My preference and for less money would be a properly built and segregated rail system. With that notion probably out the window I just hope that they do it right and can attract enough riders to justify its construction.
If they get more cars off the 401 and cut the flights between montreal toronto and ottawa by half it will be well worth it.
 
Much as I think this train is a huge boondoggle that will saddle our kids with even more outrageous debt, I DO NOT want any Govt making decisions on infrastructure based on how the next election might go. Do what's good for Canada, not any political party future.....
I don’t disagree at all. But we all know those calculations are made all the time. Was it a coincidence the Feds said no to expanding the island airport at the same time they have a by-election in Toronto?
 
I'm still sceptical about making the leap from the limited inter-city rail culture that we have all the way to HSR. I like rail and I like the idea of HSR and certainly have enjoyed being able to travel around France on their network. But even though the Windsor-Quebec corridor is the most densely populated area in Canada it's still a far cry from the population density of central Europe or Japan.

People say this. But it's not true.

The Quebec-Windsor Corridor has population density on par with Southern France or Spain. And Toronto-Ottawa-Montreal is very similar in both population and distances to one of the most successful HSR lines around: Madrid-Zaragoza-Barcelona. And Spain doesn't have our winters or our air fares.

The start of this video should help with the comparison:


It's unfortunate how prevalent Small Canada syndrome is these days. People can't even imagine that a country of 40M (similar to Poland) might have a corridor that needs HSR.
 
Much as I think this train is a huge boondoggle that will saddle our kids with even more outrageous debt,

This train does a whole lot more for my generation, and every one that follows than the $80B per year and rising in OAS that is paid out and majority deficit financed.
 
You mean "my generation" whom live in the corridor..........and the very small percentage of those who would take it.
 
There is a political calculus as well that the Feds will have to account for. All lot of the stop Alto signs that are popping up on people's front lawns are from the Ontario Landowners Association, a group not know for it's love of Liberals. Last year, with provincial and federal elections just a month or so apart this riding went Tory provincially and Liberal federally. It wouldn't take much to have it go completely blue.

Here's an easy prediction. Once the actual route is announced and the majority of those folks find out they aren't impacted, they'll go on to be mad about something else. The 10 km wide swatch they published has a lot of people in it. The actual Right of Way they need is 60m. With maybe a few more metres in places where they need to put servicing equipment, or emergency pads. There'll be folks getting checks for business impacts who don't lose a square inch of land.

It's no different than any major highway being built. Maybe somebody should ask why the OLA is fine with provincial expropriation for Hwy 413 (they didn't speak out about that) than they are about Alto (with far less).
 
There's a crass political calculus on top of everything - are there more votes from "Canadian workers. Canadian steel. Canadian rail." than from the Ontario Landowners Association, and where are those votes located (Hamilton and the Soo).

Rural Ontario is no different than downtown Toronto. Safe ridings are ridings that are going to be ignored.

HFR was originally pushed by a Conservative MP (Deal Del Maestro) from Peterborough. It was then supported by the Liberals because they wanted to win that riding. I imagine that adding Kingston now adds more ridings that support this thing.
 
Just like transit. Every person who takes it, is one less car in front of you on the road.
Makes sense, since I do only go to Ottawa and Montreal when I jump in my car.....[insert sarcasm emoji]
 
You mean "my generation" whom live in the corridor..........and the very small percentage of those who would take it.
Im from the generation you keep referencing being saddled with debt. Elder Gen Z. We generally want these sorts of projects built. We are one of the largest economies on Earth, we have a corridor as dense as the parts of Europe that love HSR and we have the technical tradesmen skilled enough to build it. Id be more than happy to see this built for future generations, even if I live in lil ole Manitoba and will never see the benefits, partly because I believe in the economic and sustainability benefits that usually come with these sorts of projects and partly because I dont believe we're crabs in a bucket. We're a country, if millions upon millions of my fellow citizens can use and access this service in the future, Im all for it. A win for Canada, even part of it, is enough for me.

If money is a legitimate concern, lets get creative. Cut OAS to people who dont need it, thatll probably economize 25-30% of its budget hit. Sell treasuries to fund it contingent on the materials needed coming from Canadian suppliers (steel, aluminum and concrete will be needed in spades), etc. We can walk and chew bubblegum and I personally think this will be a major win, even just for the projected productivity gains.
 
  • Like
Reactions: ytz
In my rural village in the east end of Ottawa there are a lot of "no Alto" signs and the farmers around here are pretty staunchly against it. The CN right of way runs between us and the 417 and right along the southern edge of the village is the Prescott-Russell rail trail extension, which runs on what is still a right of way owned by VIA. So a lot of folks are worried about the potential for Alto see that as a viable option. Frankly I think that's doubtful. It was a single line and it is now so close to built up areas that I would imagine the environmental assessments would rule it out running so close to the community. I emphasize with the farmers but I think we're a long way from knowing just how Alto would work to mitigate and compensate for impacts on their land. Personally, I'm not worried about my property value.

That being said, I do think Alto and the government haven't done a very good job of controlling the narrative. Nor have they helped themselves by denying to our Councillor that they were responsible for marking showing up on the roads around us and then fessing up that while it wasn't them it was a subcontractor doing survey work. That just feeds into trust issues.

There is a political calculus as well that the Feds will have to account for. All lot of the stop Alto signs that are popping up on people's front lawns are from the Ontario Landowners Association, a group not know for it's love of Liberals. Last year, with provincial and federal elections just a month or so apart this riding went Tory provincially and Liberal federally. It wouldn't take much to have it go completely blue.
When it was originally HFR, the assumed routing from Ottawa to Montreal was on a railbanked ROW (which might be that rail trail - and I don't know if VIA still owns it), and assumed that it go to downtown Montreal using existing CN/VIA trackage. Now there is talk of flipping over to the Quebec side of the river and entering greater Montreal from the north. I'm not that familiar with the geography, but connecting downtown Montreal and carrying on to Quebec City was going to be a big problem. I now hear talk about boring another tunnel through Mount Royal (ca-ching).

Did the farmers and locals put up a fuss when 417 was pushed through?

I'm not exactly sure Randy and his OLA crowd would even be happy with a blue government. They are one step off sovereign citizen status.

One argument being made in favour of HSR over HFR was the need to be competitive with flying. High frequency service, while better than current VIA in terms of on-time performance, was never going to be able to compete with flying; HSR can. I understand France has recently mandated the cancellation of a number of flights between cities that are now served by HSR.
 