Retired AF Guy
Army.ca Veteran
- Reaction score
- 993
- Points
- 1,160
MilEME09 said:https://buyandsell.gc.ca/procurement-data/tender-notice/PW-20-00907488
Any one know if this is the planned surveillance suite for the LAV 6?
From the attached document:
1.5. Project Scope 1.5.1. The scope of the ISR Mod project covers the hardware, software, and specialty equipment necessary to implement and train use of a digitized Land ISR system and modern sensors. The ISR Mod project scope will include the following system components:
a) Land ISR digitized C2 System that interfaces with the Land C2 and Battle Management System to integrate sensor information. It also needs to distribute information and intelligence to support manoeuvre forces, targeting and Joint Fires. The digitized system must ensure a sensor-to-effector linkage and will incorporate Allied standards for information, communications;
b) Applications to streamline ISR information, aid in the tactical use of ISR data and the necessary gateways to migrate the information into the Land Battle Management System, Joint Fires and other applicable systems;
c) ISR applications to reduce cognitive load, improve awareness and facilitate information sharing;
d) ISR applications or software to improve sensor efficiency, cross-queuing and maximize sensor performance of both in-service and future systems;
e) Modernization and integration of the existing CAF sensors, both hardware and software, into a unified ISR network;
f) Acquisition of new sensors that address sensor gaps or obsolescence issues with the existing CAF sensor;
g) Integration of the existing and new sensors into the Army armoured fighting vehicle fleet;
h) New UAS platforms to carry sensors that cannot be integrated into existing Army UAS;
i) Ability to carry sensor payloads on specialized armoured vehicles or networking infrastructure that cannot currently be integrated into existing Army armoured vehicles;
j) Specialized communication systems to supplement existing and future communication systems to facilitate information flow;
k) Distributed and networked Training Simulation System; and
l) Initial provisioning of two (2) years spare parts and the establishment of In-Service Support Contracts: repair & overhaul, software upgrades, technical investigations and sparing.
Link