I did the approvals for A & B years ago.And jetty replacement at Esquimalt plods along …..![]()
I did the approvals for A & B years ago.And jetty replacement at Esquimalt plods along …..![]()
Am I correct in understanding that A Jetty design is being reviewed by the navy for lessons learned from B and also original spec was based upon 2 Halifax class @ 134m vs 2 River class @151m ?I did the approvals for A & B years ago.
Well that’s a 17m potential problem.Am I correct in understanding that A Jetty design is being reviewed by the navy for lessons learned from B and also original spec was based upon 2 Halifax class @ 134m vs 2 River class @151m ?
I was in those meetings a long time ago, as far as I remember the design for A jetty accounted for River class. Lessons learned for B jetty is pretty standard. A jetty was to nest River class anyways, so there would be two of them. A lot more nesting is going to happen as the RCN gets bigger with all the subs, destroyers, AOR's and AOPS taking up realestate.Am I correct in understanding that A Jetty design is being reviewed by the navy for lessons learned from B and also original spec was based upon 2 Halifax class @ 134m vs 2 River class @151m ?
6 AOPS . Up to 12 subs. I would even say the announcement of 15 River class is subject to change.You forgot the corvettes, Underway.
Another question here: When the RCN decided to replace the 5 Glen tugs and 2 fireboats with four - because the new tugs would be all capable of firefighting - that was premised on 2 AOR, 4 subs, 15 RCD's and 5 AOPS. Now that we are going to 12 subs and possibly up to 12 corvettes on top of that, and considering the tugs secondary functions (such as towing targets and sometimes operating in the approaches in support of the fleet, is 4 going to be enough, or do the numbers have to go up to, perhaps, 3 per coast?
The question I have is; are the new tugs suitable for handling submarines given the different hull profiles?6 AOPS . Up to 12 subs. I would even say the announcement of 15 River class is subject to change.
Given how much the corvettes has basically ballooned into a bespoke, all Canadian PC6 rated miniature Halifax class frigate, either the River class is going to see its production numbers cut or these corvettes will be purchased in very small numbers (4-6).6 AOPS . Up to 12 subs. I would even say the announcement of 15 River class is subject to change.
I was wondering if the Rivers got moved down to 6 and these new Corvettes get to be around 12-15 of them.Given how much the corvettes has basically ballooned into a bespoke, all Canadian PC6 rated miniature Halifax class frigate, either the River class is going to see its production numbers cut or these corvettes will be purchased in very small numbers (4-6).
The question I have is; are the new tugs suitable for handling submarines given the different hull profiles?
Sounds like the LVM project. The replacement has a higher load capacity, so that justifies buying less of it.You forgot the corvettes, Underway.
Another question here: When the RCN decided to replace the 5 Glen tugs and 2 fireboats with four - because the new tugs would be all capable of firefighting - that was premised on 2 AOR, 4 subs, 15 RCD's and 5 AOPS. Now that we are going to 12 subs and possibly up to 12 corvettes on top of that, and considering the tugs secondary functions (such as towing targets and sometimes operating in the approaches in support of the fleet, is 4 going to be enough, or do the numbers have to go up to, perhaps, 3 per coast?
Sounds like the LVM project. The replacement has a higher load capacity, so that justifies buying less of it.
The current idea is up to 6 CPC and still 15 Rivers. The Rivers are expeditionary, and the CPC are going to plug into the continental defence grid/matrix/plan. Along with the submarines who will probably be mostly continental with a little bit of expeditionary.I was wondering if the Rivers got moved down to 6 and these new Corvettes get to be around 12-15 of them.
The original plan for the Halifax's was to be 18 but the final block of 6 got cut because of the attempt to get us a dozen nuclear subs. Building 15 Corvettes and 6 Rivers would take us to what we would have had previously - 18 Halifax's and the 3 Iroquois for 21 capital warships.
Not the subs based on the jetty plan, maybe CPC, depending on the draught. There certainly is enough space for it.Question for people in Esquimalt, since I've never seen it in person to make that determination: When the MCDV's are retired, can "Y" jetty accommodate either the CPC's or the new submarines, at least when they are not in a short work period?
Not to mention, the projections I've seen show it will be difficult to spend that 3.5% anyway. I have it on pretty good authority that staff are looking at shortening LCM to 20 years on major assets such as ships and aircraft just to meet the 2% continuous spend, let alone 3.5%. Going to 3.5% has Canada adding entirely new capabilities (or reawakening them - see Expeditionary Bde Gp). In other words, there are no fiscal reasons to reduce the Rivers to pay for a new class of Corvettes. That could change of course, but at this time money is not a problem!The current idea is up to 6 CPC and still 15 Rivers. The Rivers are expeditionary, and the CPC are going to plug into the continental defence grid/matrix/plan. Along with the submarines who will probably be mostly continental with a little bit of expeditionary.
Absolutely nothing has changed with the Rivers. We need continuous build and cancelling them would not be continuous.
I hope that you are right. It’s makes the most sense and certainly allows us to have a real blue water fleet going forward, especially if we get 12 subs.The current idea is up to 6 CPC and still 15 Rivers. The Rivers are expeditionary, and the CPC are going to plug into the continental defence grid/matrix/plan. Along with the submarines who will probably be mostly continental with a little bit of expeditionary.
Absolutely nothing has changed with the Rivers. We need continuous build and cancelling them would not be continuous.