• Thanks for stopping by. Logging in to a registered account will remove all generic ads. Please reach out with any questions or concerns.

Pipelines, energy and natural resources

  • Thread starter Thread starter QV
  • Start date Start date
It’s a bit like buying an apple from New Zealand in my grocery store in Burlington, ON at a price that’s cheaper than the Courtland apple that was grown 80km in Vineland, ON……
and meanwhile the orchard on Guelph line has been cut down: not profitable
 
It’s a bit like buying an apple from New Zealand in my grocery store in Burlington, ON at a price that’s cheaper than the Courtland apple that was grown 80km in Vineland, ON……

From the comments... ironic:

"Nova Scotia alone sits on up to 60 trillion cubic feet of LNG. Why is this even happening?"
 
and meanwhile the orchard on Guelph line has been cut down: not profitable
Brutal!
Some older Mississaugian told me a number of back that Peel Region used to be known as the Orchard of the British Empire. Now, well, you know….
 
The other part people forget is how much of the tourism is based upon infrastructure created originally for/by the forest industry. When the FSR roads aren't being maintained...it doesn't matter what's down there when they wash out.

It's actually one part I respected from BC forestry operations was the longer term planning in many areas where they would condition...as part of harvest approval...building certain access/staging to higher than needed logging standards in order to allow for future use for other industries. In exchange the cost difference would be credited back to the company and would be considered payment in kind (vs. dollars) when crown invoices for things such as timber dues would be required.

Canada is really big...and if we just travel the TransCanada highway I think a person gets an okay view of Ontario's landscape...but you miss so much of the west due to all the access focused in the southern 1/3rd of the province. Most folks never see the other corners of the province where small towns, rural farms and First Nations live and rely up on the limited resource jobs in the areas.

Meanwhile, we could learn a lot from Mexico (and Las Vegas):

 
Some pipelines are going ahead...


Pembina greenlights two pipeline projects in Alberta, B.C.

Pembina says the two pipeline expansions it has sanctioned represent a total investment of $425 million and are set to come into service next year.

One $310-million project would see a new 95-kilometre pipeline that would ship 120,000 barrels per day of natural gas liquids between Birch and Taylor, B.C.

The firm has also decided to go ahead with an initial phase of a new pipeline connecting Taylor to a pump station in Gordondale, Alta., at a cost of $115 million.

"This milestone reflects strong collaboration with both Indigenous and local communities built on trust and open engagement," CEO Scott Burrows said in a news release Thursday.
 
Some pipelines are going ahead...


Pembina greenlights two pipeline projects in Alberta, B.C.

Pembina says the two pipeline expansions it has sanctioned represent a total investment of $425 million and are set to come into service next year.

One $310-million project would see a new 95-kilometre pipeline that would ship 120,000 barrels per day of natural gas liquids between Birch and Taylor, B.C.

The firm has also decided to go ahead with an initial phase of a new pipeline connecting Taylor to a pump station in Gordondale, Alta., at a cost of $115 million.

"This milestone reflects strong collaboration with both Indigenous and local communities built on trust and open engagement," CEO Scott Burrows said in a news release Thursday.
There has been a major, and quietly done, realignment and optimization of pipeline flows as companies have consolidated fields and plants for increased efficiency. 25 years ago companies talked about developing a well...now it's a field+ at a time. As a result outfits like Pembina have also been creating smaller scale additions to the network.

One thing I've noticed is regardless of end goal design many companies are chunking projects into these smaller segments - more contractors can bid on smaller jobs (and reduced costs), easier to keep on task, and easier permiting process instead of doing 1,000+ segments like TransMountain.

Will be more interested to see if the second project requires federal overview as it's a cross-border pipeline and usually when NEB would get involved and process a project to death. Although BC -> AB seems to have less rigor than AB -> BC (my personal observation only).
 
There has been a major, and quietly done, realignment and optimization of pipeline flows as companies have consolidated fields and plants for increased efficiency. 25 years ago companies talked about developing a well...now it's a field+ at a time. As a result outfits like Pembina have also been creating smaller scale additions to the network.

One thing I've noticed is regardless of end goal design many companies are chunking projects into these smaller segments - more contractors can bid on smaller jobs (and reduced costs), easier to keep on task, and easier permiting process instead of doing 1,000+ segments like TransMountain.

Will be more interested to see if the second project requires federal overview as it's a cross-border pipeline and usually when NEB would get involved and process a project to death. Although BC -> AB seems to have less rigor than AB -> BC (my personal observation only).

I'm sure they're doing work that can be considered already 'pre-consulted' to save time.
 
I'm sure they're doing work that can be considered already 'pre-consulted' to save time.
To be fair to the oil and gas industry I don't hear a ton of complaints over their consultation. The lesson the industry has learned is to go in early, before surveying if possible, and start the relationship building instead of showing up last minute and trying to rush. It's often easier to talk about specific areas and focus upon a few communities instead of entire projects as well as it allows for less finger pointing/balancing of impact issues (why did the Salish in BC get this when the Ojibway in Manitoba get peanuts type talk). It's also much easier to get both provincial and federal permits on smaller segments than major lines....especially when some like DFO have very strict timing requirements and short operational lifespans.

So for the last decade or so alot of large pipe has been installed by stitching small jobs together...one big job every year vs. a once in a life time build. On the First Nation side of things they are noticing this as well though and would not be surprised if more resistance is occurring than past years as more "lands taken up" by industry increases.
 