That's what Ontario (Hydro One) recently did when upgrading an electrical transmission corridor in northern Ontario. The original line went through both a National Park and a FNT. The new corridor took a different route to avoid both.I see the same situation with pipelines and first nations. If there is too much resistance then bypass and isolate.
That sounds inaccurate. I saw on TV a statement he made. He dodged the question by noting there were no projects in contemplation at a stage that warranted addressing the issue. That isn't a flat "no".
![]()
Eby pours cold water on Carney’s pipeline consensus plan
B.C. Premier David Eby is throwing shade on the pipeline consensus presented by his colleagues at the meeting between Canada’s premiers and Prime Minister Mark Carney earlier this week. Carney previously said he would support building pipelines if certain conditions were met, one of them being cotruenorthwire.com
However, Eby said he would not support building a new oil pipeline through B.C.
If that isn't a NO, I don't know what is, but I'm not getting flustered over wording.
AGG, which operates the Port of Churchill and the connecting Hudson Bay Railway (HBR) in northern Manitoba, strategically links Western Canada to Arctic waters and from there offers routes to Europe, South America and the Middle East.
Stretching for 1,000 kilometres from The Pas in central Manitoba to Churchill on Hudson Bay’s western shores, the HBR is also a lifeline for 33,000 people living in isolated areas with limited road access, said Hicham Ayoun, senior communications adviser at Transport Canada.
The Port of Churchill, Canada’s only deep-water Arctic port connected to mainland, ships goods such as critical minerals, construction equipment and agricultural and energy products to Southern Nunavut’s Kivalliq region and the rest of the world.
The port and railway were returned to Canadian hands in August, 2018. A partnership of OneNorth – a group of 29 First Nations and 12 communities in Manitoba and Nunavut – and Fairfax Financial Holdings Ltd. acquired them from Omnitrax and commenced repairs, supported by federal funds. The Churchill community welcomed back the first train in November, 2018, after 18 months of shutdown.
Fairfax left the partnership two years later, leaving OneNorth the sole owner of AGG, owned by a partnership of 29 First Nations and 12 communities in Manitoba and Nunavut, Mr. Avery said.
Mr. Avery said the company currently employs 150 workers,
The company marked a milestone in August with the first shipment of critical minerals from the port. This included around 10,000 tons of zinc concentrate from Snow Lake, Man., loaded onto the HBR and cargo vessels, and destined for Belgium.
The group is building a new storage facility to ramp up critical mineral shipments, “the first new building at the Port after decades of neglect,” according to the report.
Mr. Avery said Europe is a critical minerals major market for AGG. The group plans to transport up to 20,000 tonnes of minerals this year, including potash for food production. New exports will also include sand used in new technologies such as solar panels. Construction equipment, trucks and building materials are instead on the list for Nunavut communities.
Two premiers of Canada’s territories say they are optimistic that the three ministers who mark significant Northern representation in the new federal cabinet might lead to better co-operation and significant projects being completed.
Yukon Premier Ranj Pillai said it will make “a world of difference” not to have to explain the opportunities and challenges of the North to federal counterparts. Northwest Territories Premier R.J. Simpson agreed, saying they will be able to get right to the issues at hand during meetings.
“The fact that we’re going to have people at the cabinet table who have that knowledge and have that background and are able to educate their federal colleagues, is going to go a long way to ensuring that the decisions that are made about Canada and about the North are actually informed,” Mr. Simpson said in an interview Friday. “To me, that’s the most exciting part.”
Prime Minister Mark Carney’s cabinet, unveiled last week, includes Indigenous Services Minister Mandy Gull-Masty, whose riding includes Northern Quebec; Crown-Indigenous Relations Minister Rebecca Alty, who represents the Northwest Territories; and Northern and Arctic Affairs Minister Rebecca Chartrand, whose riding is in Northern Manitoba.
Buckley Belanger, named the secretary of state for rural development, represents Northern Saskatchewan. Mr. Carney was born in Fort Smith, NWT
Nova Scotia billionaire John Risley says Canada has neglected the Arctic for far too long, which has undermined the country’s economic prospects and put its sovereignty at risk. He’s betting he can light a fire for change.
Mr. Risley, who made his fortune with Clearwater Seafoods before turning to investments in MDA Space and green energy, has launched a new company called Arctic Economic Development Corp. (AECD). It’s aiming to spur large-scale growth in Canada‘s North, primarily north of the 60th parallel, by marshalling a wave of new capital, private-sector expertise, and partnerships with government and Indigenous Peoples such as the Inuit.
“We haven’t really stepped up as a country” in devoting enough attention to the Arctic, Mr. Risley said in an interview this week with The Globe and Mail. Public underinvestment in the Coast Guard has left Northern waters exposed while corporate Canada “hasn’t woken up to the opportunity,” he said.
“It’s sort of hard to get to. It’s difficult to do business in. There are short windows of opportunity because of weather. And all that needs to change,” Mr. Risley said. “It’s an area, as we are learning, of strategic importance to the country. And somebody needs to be a proponent of this from the private sector and help both business and government get things done up there and done in a hurry.”
Melting ice and increasingly volatile geopolitics are changing the face of Canada‘s Arctic region, which makes up nearly 40 per cent of the country’s land mass despite being home to only 150,000 people. Both China and Russia have been increasing their naval activity in the Arctic via research ships and military patrols, prompting a warning by former NATO secretary-general Fogh Rasmussen this month that the alliance needs to take on a “stronger role” in the region.
Mr. Risley said his startup believes it can be a catalyst for Canada‘s economic expansion in the North, pulling together its connections and partnerships to forge private-sector-led investment and infrastructure development. Discussions have already begun with pension fund managers and other infrastructure players who might be interested in funding projects, he said.
The company is working on an early project with Qikiqtaaluk leaders in Nunavut’s Baffin region that would see Horizon Maritime, a marine services company co-owned by Mr. Risley, quarterback the procurement of polar-class icebreakers for private and public purposes. It also wants to speed up projects for things such as satellite communication service, warehouses and resource access through new transportation infrastructure.
“I’m in love with the Arctic,” Mr. Risley said. “I’ve spent quite a bit of time up there. I see it changing. And I see it as both an opportunity and a concern. We can do this the right way and we can do it the wrong way. And so I want to be part of doing it the right way.”
The Nova Scotia businessman has a track record of collaboration, particularly with Indigenous partners. After Clearwater signed a landmark agreement on surf clam harvesting with 14 First Nations in Atlantic Canada worth millions in revenue-sharing, he went further and sold the entire company to a coalition of Mi’kmaq bands and Vancouver-based Premium Brands Holdings Corp.
Nothing will happen now without the involvement of local communities, Mr. Risley said, adding that these are economic opportunities that belong to the North.
“This is not going to be an agenda run out of Toronto or Ottawa or Halifax,” he said. “They’re going to be at the boardroom table helping make decisions and deciding what gets support and what doesn’t. You can’t do things in the North in the absence of social licence, I can promise you that.”
The most recent concrete plan for a national-scale response to infrastructure gaps in the near North was pitched several years ago by researchers at the University of Calgary’s School of Public Policy and the Montreal-based CIRANO research group. The proposed Canadian Northern Corridor, endorsed in 2017 by the standing Senate committee on banking, trade and commerce, calls for a 7,000-kilometre designated right-of-way stretching across the country for roads, rail, power transmission, pipelines and communication networks that would connect to existing infrastructure in Southern Canada.
I seem to remember that we tried building some new road in our sector of Afghanistan under the premise of ‘nation building.’From a couple of days ago:
![]()
Arctic Gateway Group says the Port of Churchill will help diversify Canada’s trade links to other countries
AGG strategically links Western Canada to Arctic waters and from there offers routes to Europe, South America and the Middle Eastwww.theglobeandmail.com
...
Alaska Highway
Great North Road
These were and are typical of many roads around the world. They were built for strategic purposes, to communicate, to move troops, to move supplies between two distant points. Traders set up around the military posts and stopping points along the way. Miners and others used the roads to reach into the newly available territories. Fortunes lost and made. New cities built.
The people moved in after the roads were built.
I always got the impression the premise was “it’ll be marginally harder to IED us if it’s paved.”I seem to remember that we tried building some new road in our sector of Afghanistan under the premise of ‘nation building.’
Some details on rail line improvementsFrom a couple of days ago:
![]()
Arctic Gateway Group says the Port of Churchill will help diversify Canada’s trade links to other countries
AGG strategically links Western Canada to Arctic waters and from there offers routes to Europe, South America and the Middle Eastwww.theglobeandmail.com
...
Alaska Highway
Great North Road
These were and are typical of many roads around the world. They were built for strategic purposes, to communicate, to move troops, to move supplies between two distant points. Traders set up around the military posts and stopping points along the way. Miners and others used the roads to reach into the newly available territories. Fortunes lost and made. New cities built.
The people moved in after the roads were built.
This project intrigues me.Some details on rail line improvements
![]()
Record-Breaking Construction Progress for Hudson Bay Railway and Port of Churchill in 2024 — Arctic Gateway Group
RECORD-BREAKING CONSTRUCTION PROGRESS FOR HUDSON BAY RAILWAY AND PORT OF CHURCHILL IN 2024www.arcticgateway.com
Fully aware BC processes are very different and more/different checks needed for different reasons. In Alberta most of the projects are based upon:Linier projects are hard.
- First find a engineering company with experience in the field and negotiate contract, Terms of Reference (TOR), etc
- Design a project using existing information, both public and privately held. Normally this is done on the quiet.
- Find a potentiel client for your product and get a notional contract
- Submit a project description to the relevant authorities for a decision on the EA process, begin social licence marketing
- Begin talks with potentially affected indigenous groups. (Note some proponents actually do 5 first, then 4)
- With a TOR from the government, seek exploration permits and land access agreement from the FN to begin detailed route surveys
- Submit revised route plans based on geophysical issues, sensitive ecological, important FN sites, archeological sites and issues with other landowners and existing infrastructure.
- Governments determine if the revised route still falls under the original scope or a new TOR needs to be issued.
- Start the full public EA process, open houses, federal and provincial consultations begin with interested FN's
- Determine if anymore route changes are needed and any information gaps are filled.
- If no major changes then a positive EA decision may be given.
- Firm up contract with client, get Final Investment Decision from company board
- Regulatory submissions by the proponent to authorities, then they begin regulatory consultations
- Construction begins, normally in multiple locations at once
- new issues emerge, (geophysical, archeological typically) require some route alterations.
- The new route alterations are assessed to see if they fall under the scope of the existing review, if yes, they are assessed, consulted apone and then a modified EA certificate is issued. Trigger, new regulatory reviews of those sections.
This is a simplified list of the process
I kind of figured it wouldThis project intrigues me.
As of 2008, the port had four deep-sea berths capable of handling Panamax-size vessels for the loading and unloading of grain, bulk commodities, general cargo, and tanker vessels
Undisclosed buyers bought the tankers from Diamantis Diamantides and family, the beneficial owners of Delta’s fleet, with all currently being used to ship Russian crude
- 21 Dec 2022
Recent notable deals include two suezmax units, the sale of which was reported by Belgium’s Euronav today.
They comprise the 2006-built Statia (IMO: 9302982) and the 2008-built Sapphira (IMO: 9336983). The 150,205 dwt pair have been acquired by private interests of Euronav's controlling Saverys family.
Meanwhile, brokers report the sale of the 2009-built very large crude carrier Advantage Virtue (IMO: 9379698). This 296,000 dwt ship is reported to have been sold to Chinese buyers for $51m.
In the aframax segment, Pertamina is said to have acquired the five year old long range two tanker STI Lily (IMO: 9838242) from Scorpio Group for $73.5m.
Recent medium-range tanker sales included the SR Navigation-owned Caribbean Star (IMO: 9278698). This 20-year-old, 46,000 dwt vessel was sold to undisclosed buyers for $17.9m.
Diamantara noted that although five-year-old and 10-year-old tanker values remain at their highest levels in 16 years, values of 15-year-old ships and older have corrected recently.
She said MR units have been the driving force behind sale and purchase activity in 2024, with such vessels accounting for some 33% of all sales so far. This is followed by the aframax/LR2 segment, with a total of 53 vessel sales.
“MR2s and LR2s have emerged as highly sought-after assets, due to increasing preference for clean trading options,” said Diamantara.
“These versatile vessels offer the flexibility to transport both clean and dirty cargoes, making them attractive to a wide range of shippers and traders.”
In the past four months, tanker values have witnessed a notable trend, with MR2s experiencing a significant uptick while prices for VLCCs, suezmax, and aframax units have remained relatively stable.
Since early June, the market for tankers of more than 80,000 dwt has seen a period of price stability.
However, a distinct divergence has emerged in the MR2 segment, said Diamantara who noted that five-year-old and 10-year-old MR2s have seen a marked increase in value, due to robust demand.
She said presently, five-year-old MR2s are valued at around $50m, representing a 10% increase compared to June 2024 levels. Within the same period, asset values of 10-year-old MR2s are up by 8%, to around $41m.
“The MR Atlantic Basket and MR Pacific Basket experienced a period of robust freight rates from January 2024 to mid-July 2024, propelling the values of MRs to 16-year highs.
“While both baskets have subsequently retreated to year-to-date lows, the long-term outlook for the MR market remains positive, mainly as we approach the winter season.”
Diamantara noted that despite the 34% decline in sale and purchase activity in 2024, the demand for modern, fuel-efficient vessels has seen a significant increase.
Since January, some 60 tankers of up to 10 years old have been sold, compared to only 31 sales of such vessels between January and September 2023.
There has also been an increase in demand for scrubber-fitted tankers this year when compared to the same time period of 2023.
From the beginning of this year, more than 30% of all tanker sales were of vessels fitted with exhaust gas abatement systems, compared to 18% in the first nine months of 2023.
Diamantara said ships equipped with scrubbers, or fitted with electronic main engines, will command a price premium compared to more basic vessels without such characteristics.
Furthermore, vessels engaged solely in clean trades or ships featuring the latest hull coatings and energy-saving devices will also be able to obtain higher prices.
“Premium pricing for higher specification vessels is not easy to quantify and to put a price tag next to it," said Diamantara.
“A ship’s value is influenced by several factors, such as the prevailing market conditions at the time of purchase, vessel age and trading patterns."