- Reaction score
- 3,422
- Points
- 1,120
Did this facility get built?
Is it still standing?
Have the RCA considered playing with it to see whether or not the same architecture can accommodate some of the kit they are considering?
Yes,
Yes.
BUT.
The LBTS was assembled in Dartmouth, and was used to validate and test the operational software, with the eventual understanding/plan being that it would be shut down and moved to Halifax for installation at the Pullen Building.
I haven't been in the Pullen Building much since this whole move was in progress....so I'm not sure how that's going.
As for getting access to it....well...the RCN was supposed to be going to multiple shifts per day to stagger the access to the systems. Techs, Operators, and developers all need a chance to play with it.
NS