That's a mighty undertaking. If we can get 1.5-2.5m/day more out the door = pushing us to 6 and beyond, that should be considered a solid win.I reckon that if they can squeeze 1.3 mbpd through the 890,000 bpd TMX then they a similarly dimensioned pipeline engineered for 1 mbpd could also be uprated to 1.3 mbpd or better.
The game plan is to get Alberta to 8 mbpd of production. Currently setting around 4.1 to 4.4 mbpd. We were just under 4 in 2024.
TMX took us from 300,000 to 890,000 - 590,000 bpd increase or 15% on the 4 mbpd. 1.3 mbpd from 890 kbpd means 9%.
8 mbpd means 4 increases of 25%.
Or 4 new pipelines.