• Thanks for stopping by. Logging in to a registered account will remove all generic ads. Please reach out with any questions or concerns.

Canadian River Class Destroyer Megathread

Just a thought but just because a ship is designed doesn’t mean it has to be built immediately or perhaps at all.

A CDC vessel, a sub tender, a hospital ship, a C2 ship like the Blue Ridge Class, maybe a militarized AOP 😂, pick 2-3 and get the designers working.
Keeps the skills alive and the designs might prove handy?
No reason they have to design military ships is there? Might be hard to compete with the Koreans, etc. on general commercial ships but I imagine there are plenty of specialty ships for industry that could compete for. Conversions as well?
 
Oceanographic survey is a CCG job, and and also not a specialized ship anymore. You can have a UUV and offshore work ship do it no problems.

Actually, CFAV Quest and CFAV Endeavour were oceanographic research vessels that did a lot of the Defense Research Establishment work related to ASW and mine warfare. That did include some underwater surveying as required in support of that work. There is no reason further research in those fields shouldn't continue, and perhaps it is time to replace those vessels so we can continue with it.
 
Just a thought but just because a ship is designed doesn’t mean it has to be built immediately or perhaps at all.

A CDC vessel, a sub tender, a hospital ship, a C2 ship like the Blue Ridge Class, maybe a militarized AOP 😂, pick 2-3 and get the designers working.
Keeps the skills alive and the designs might prove handy?
The Mistral class does several of those things. It has C2 facilities rivaling the Blue Ridge class allowing it to act as its own command ship, and NATO Role 3 medical facilities with a 69 beds, of which 7 are fit for intensive care, and in a pinch cots and room dividers can be set up in the hangars, and the flight deck and well deck speed up medivac patient transfer.

Or there's the larger  Canberra class LHD, which has similar C2 and hospital facilities, but quite a bit more troop capacity. Maybe we could get a license for it and have Seaspan redesign it to remove the ramp (the biggest criticism of the class) and convert it to a flat top helicopter carrier, unless the E-2D can be operated off it.
 
And here we have the crux of the matter.....

The design teams that are a part of the NSPS can ONLY be part of the NSPS, because they cost too much to be relevant in the real world of ship production.

NSPS is a Jobs program disguised as a shipbuilding plan.

Ships are merely a somewhat useful byproduct.

In the 'real world' it doesn't take hundreds of millions of dollars to take a well established civilian design and modify it slightly to 'Canadianize' it for the GOC.

If they were a relevant, cost effective solution, then they'd have people beating down their doors to get them to work for them. They are not. They are overpriced, underperforming, and only 'work' in an environment where the customer is the Government of Canada.

No-one else would be willing to pay their overhead costs.
 
A submarine rescue ship would be useful, especially considering the history of our sub fleet. And an oceanographic survey ship is a capability we lost when  Quest was scrapped.
If a sub goes down you need a salvage ship.
 
In the 'real world' it doesn't take hundreds of millions of dollars to take a well established civilian design and modify it slightly to 'Canadianize' it for the GOC.
Actually it does in the "real world", those costs don't change much if you do that in Europe or the US, because some of that design work is subcontracted to specialist firms. And what estabilished civilian design are you refering too exactly? And how do you define established? Because my definition is of established is designed, built and iterated over years. And we certainly don't have one of those in production anywhere.

If they were a relevant, cost effective solution, then they'd have people beating down their doors to get them to work for them. They are not. They are overpriced, underperforming, and only 'work' in an environment where the customer is the Government of Canada.

To buy what? Our very specialized and specific offshore science vessels or Arctic and Offshore Patrol ships? Who has a requirement for those? No body does, because Canadian needs are very specific. Also build ships with what extra capacity? The yards are working flat out just to meet the Canadian Governments orders. There isn't slack for other countries, unless the schedule gets rejigged or a yard has a solid order to expand with.
 
Last edited:
Actually it does in the "real world", those costs don't change much if you do that in Europe or the US, because some of that design work is subcontracted to specialist firms.


And what estabilished civilian design are you refering too exactly? And how do you define established? Because my definition is of established is designed, built and iterated over years. And we certainly don't have one of those in production anywhere.
My concern is civilian design companies generally are not building combatant craft, dealing with security issues that entails etc.
To buy what? Our very specialized and specific offshore science vessels or Arctic and Offshore Patrol ships? Who has a requirement for those? No body does, because Canadian wants are very specific.
FIFY

Also build ships with what extra capacity? The yards are working flat out just to meet the Canadian Governments orders. There isn't slack for other countries, unless the schedule gets rejigged or a yard has a solid order to expand with.

Solid orders for the yards has been the main issue for most of the NATO combatant craft builders.

When you look at the AB’s we still have issues getting contracts cut in a timely manner to get the long lead time items, and the same occurs on the VA class boats.

Most yards can do a lot more in terms of physical capacity - but one needs materials and just as (if not more) importantly; a stable trained workforce.
 
Once again why? Our warships are not designed to enter any ice. And why would you put a warship whose main defence is maneuverability within an ice pack. Its like making your infantry trying to fight in quicksand.
Thank you…that is the sort of answer and clarification I was looking for.
 
Back