- Reaction score
- 10,369
- Points
- 1,140
The thing the projects being completed in the next 12-24 months have in common is that they started before the USA went batshit crazy.Besides this ongoing saga on the F35, I'm not aware of many contracts occurring in the next 12-24 months that don't have LM or the US front and centre. The subs never had any US angle to them. The CDC points to being CDN as much as possible, with Euro armaments. What's on the runaway over 12-24 months that's not LM or US already and could be someone else? Tanks maybe, but I thought that the runway is longer than 24 months.
Anything new/anything not yet signed should preference things not made in America, not completely bar, but preference other, less volatile partners. We have at least three more years of volatility, and no guarantee America after Trump will be anything like the America of the past.

