KevinB
Army.ca Relic
- Reaction score
- 30,539
- Points
- 1,260
At this is the stuff that make Future Force people prematurely age.How many of each of the new tools do you need?

At this is the stuff that make Future Force people prematurely age.How many of each of the new tools do you need?
At this is the stuff that make Future Force people prematurely age.
There is, the problem is no one can afford it.There is no right answer.
BEG - BEST EDUCATED GUESSLike the man said about the candy with no label: you'll just have to suck it and see.
As @Brad Sallows said about WW2.
We will just have to keep trying.
There is, the problem is no one can afford it.
BEG - BEST EDUCATED GUESS
Wrong. First guy should have knifed him.Two guys in the ring throwing punches.
Which one should they have thrown first?
Should have shot the knife weilderWrong. First guy should have knifed him.
If you are in a fair fight. You are doing it wrong.
Should have shot the knife weilder
Wrong. First guy should have knifed him.
If you are in a fair fight. You are doing it wrong.
Should have shot the knife weilder
Because a heavier one can do stuff like Mine plowing, assault breaching, defensive earthworks.
Like just about anything, there is an advantage in having light, medium and heavy options to suit the circumstances. You may only need 100 of the heavies versus 10,000 of the lights, but unless you can couple a number of light systems into a single unit to be able to complete the heavy function - well, you need what you need. The task defines the tool.
![]()
It is slow - they sink rather unpleasantly in soupy mixes as the ground pressure is a lot higher than Tracked Military Vehicles.![]()
Caterpillar D9 - Wikipedia
en.wikipedia.org
Cat D9 weighs 50 tonnes.
Lots of momentum there.
Getting rid of the onboard operator is an easy start. Adding armour to protect it's vitals contributes to its primary role and doesn't detract.
The issue is more what scenario does this help with?...
Thought experiment
5 CC-177s
17 CC-130s
9 CC-330s (too bad some of the fleet is not being supplied with the 330-200F main deck cargo door gut still)
4x D9 UGVs in the CC-177s
16x Roshel Senators and 32x ISVs in the CC-130s
A Light Infantry Battle Group of 600-800 troops with personal kit in the CC-330s
How many pallets of Loitering Munitions, $3000 UAVs and $30,000 UGVs could also be transported?
What weapons could be mounted on the D9s, Senators, ISVs and UGVs?
What type of assault could such a force generate in one lift?
What could be generated with a week long lift?
Do the guns and MRLs have to come in the CC-177s or can adequate support be generated in CC-130 compatible vehicles like CESARs and HIMARS?
The CC-330s can bring pallets of ammunition and UxVs.
It is slow - they sink rather unpleasantly in soupy mixes as the ground pressure is a lot higher than Tracked Military Vehicles.
The issue is more what scenario does this help with?
Not manyNope.
The issue is how many scenarios could be managed within that envelope?
You need to do threat and risk assessments -- that allows you to focus towards the most Likely, and the Most Dangerous Threats.We know the resouces and constraints. We don't know the full scope of scenarios. We can generate scenarios faster than we can generate resources.
Not many
Generally when looking at creating a force you look at the possible mission, threats etc - and then build the force
I would not consider the autonomous D-9 to be much value for anyone but Ukraine or Israel -- someone in a fairly fixed situation needing to advance or create defensive works in a localized area.
The LIB ability depends on it’s construct, I haven’t seen a recent CA LIB TO&E -
Pretty much you have a force than can occupy an airfield - and fortify it - and conduct some limited penetrations in a semi-non permissive environment.
As for the odds and sods you assigned it -- pretty much nothing outside of a very limited area - as there is nothing to coordinate them or link them to anything. They will be more of a target to enemy Air, UAS, and RAM than anything else.
There is a reason why the Bde is viewed a the minimum viable deployment entity.
You need to do threat and risk assessments -- that allows you to focus towards the most Likely, and the Most Dangerous Threats.
